This is a report from Larry Shapiro:
On Monday, October 31, 2016, around 10:30 PM, Lincolnshire-Riverwoods fire crews were dispatched to the Springhill Suites hotel located at 300 Marriott Drive. The call came in after reports of smoke and flames spotted near the pool area. As a result, the alarm was upgraded to a Code 3 with an additional engine sent to the scene.
Upon arrival, firefighters found guests evacuating the building and heavy smoke coming from the room adjacent to the swimming pool. The situation was escalated to a Code 4 due to the presence of an active working fire.
Due to the thick smoke, it took several minutes for the firefighters to locate the source of the fire and bring it under control. After conducting a thorough search, ventilating the affected areas, and checking air quality on all floors, the hotel staff allowed guests to return to their rooms.
In addition to Lincolnshire-Riverwoods units including Engines 52, 53, Truck 51, Ambulances 51 and 52, and Battalion 51, several mutual aid and auto-aid companies also responded. These included Buffalo Grove Engine 27, Long Grove Squad 55, Deerfield-Bannockburn Squad 19, Lake Forest Truck 421, Wheeling Truck 24, Buffalo Grove Battalion 4, Deerfield 20, and Lake Zurich Ambulance 4.
Larry Shapiro photo
Larry Shapiro photo
Larry Shapiro photo
Larry Shapiro photo
Larry Shapiro photo
Larry Shapiro photo
Larry Shapiro photo
Larry Shapiro photo
More photos are available at chicagoareafire.com.
Install adjustment:
1.The screw conveyor can not be installed until the dust stuck during transportation or unloading
is cleaned.
2.Material groove center line and screw shaft should have an appropriate coaxial degree.
3.The drive device and the screw shaft should have a right coaxial degree.
4.The static equilibrium test should be carried out after the screw is installed.
5`After the conveyor installed, check whether there is any debris in the machine and if the lubrication is enough.
6.During the no-load test, the bearing should be oil-tight, and the bearing temperature should not be higher than 20℃. During the load test,the temperature of bearing should not exceed 30℃.
Attentions
(1) Lubricate the bearings, gears, chains and other transmission parts regularly.
(2)When the box-to-send machine stopped, check the abrasion of the spiral blade and repair and weld it when it wears seriously.
(3)The conveying amount can not be overloaded, otherwise the material will not be discharged, which may cause the screw shaft bending and box expansion.
(4) In the operation of the conveyor, if the noise is harsh, you should open the lid to check it and troubleshoot.
Flexible Screw Conveyor,Small Screw Conveyor,Cement Screw Conveyor
Zhengzhou XinFeng machinery manufacturing Co. Ltd , https://www.xinfengmachinery.com